119th Congress · introduced in the House · Sep 26, 2025
SPEED and Reliability Act of 2025
Official title from Congress.gov
Latest action (Sep 26, 2025): Referred to the House Committee on Energy and Commerce.
View on Congress.govPolicy area: Energy
No official summary has been published for this bill.
Includes amendment, cloture, and procedural votes. Each is labeled with its exact question; only a passage question is a vote to pass the bill.
No recorded roll calls on this bill in coverage.
Referred to the House Committee on Energy and Commerce.
Introduced in House
Introduced in House
Actions from Congress.gov, newest first.
LD-2 reports whose issue descriptions explicitly cite this bill (bill type and number validated against Congress.gov records). A citation does not establish the client's position or any contact with a member.
Loading lobbying reportsCoverage: reports for 2025 onward, posted Jan 1, 2025 through Oct 24, 2026.
90 citations; showing the 25 most recently posted.
DUKE ENERGY CORPORATION · lobbying firm or registrant: DUKE ENERGY CORPORATION
2026 Q3 report (Jul 1, 2026 – Sep 30, 2026) · posted Oct 21, 2026 · issue area: Energy/Nuclear
$2,190,000
Spent on own lobbying
…S. 465 - Guaranteeing Reliability through the Interconnection of Dispatchable (GRID) Power Act (transmission and siting of large transmission infrastructure). H.R. 5600 - Streamlining Powerlines Essential to Electric Demand (SPEED) and Reliability Act (transmission market reform, siting of large transmission infrastructure, an…
Congress inferred from the report year; bill number and the title cited with it match Congress.gov records, and the bill predates the report. The amount is lobbying spending for every issue on this report, not this bill alone, and none of it is paid to any member of Congress. View filing
NATIONAL GRID USA · lobbying firm or registrant: NATIONAL GRID USA
2026 Q3 report (Jul 1, 2026 – Sep 30, 2026) · posted Oct 20, 2026 · issue area: Utilities
$280,000
Spent on own lobbying
…eration and facility retirement, including relevant provisions of FERC Order 1920. Federal policy on siting and permitting, including H.R. 4766, the SPEED Act, H.R. 5600 SPEED and Reliability Act, S.4944 American Energy and Mineral Infrastructure Act, S.4475 Unlock American Energy and Jobs Act, and S. 5653, the Bipartisan Ameri…
Congress inferred from the report year; bill number and the title cited with it match Congress.gov records, and the bill predates the report. The amount is lobbying spending for every issue on this report, not this bill alone, and none of it is paid to any member of Congress. View filing
EDISON ELECTRIC INSTITUTE · lobbying firm or registrant: EDISON ELECTRIC INSTITUTE
2026 Q3 report (Jul 1, 2026 – Sep 30, 2026) · posted Oct 20, 2026 · issue area: Energy/Nuclear
$1,633,778
Spent on own lobbying
…R. 3638, Electric Supply Chain Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 4503, ePermit Act; H.R. 5600, SPEED and Reliability Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 6983, PRICE Act; H.R. 7258, Energy Emergency Leadership Act H.R. 7729,…
Congress inferred from the report year; bill number and the title cited with it match Congress.gov records, and the bill predates the report. The amount is lobbying spending for every issue on this report, not this bill alone, and none of it is paid to any member of Congress. View filing
OHIO MUNICIPAL ELECTRIC ASSOCIATION · lobbying firm or registrant: OHIO MUNICIPAL ELECTRIC ASSOCIATION
2026 Q3 report (Jul 1, 2026 – Sep 30, 2026) · posted Oct 20, 2026 · issue area: Energy/Nuclear
$70,000
Spent on own lobbying
H.R. 3616, Reliable Power Act H.R. 1047, GRID Power Act H.R.2986 Expediting Generator Interconnection Procedures Act of 2025 H.R. 5600, Speed and Reliability Act of 2025 H.R. 4218, Clean Air and Economic Advancement Reform (CLEAR) Act (Rep. Carter) S. _____ Senate Democratic Discussion Draft T…
Congress inferred from the report year; bill number and the title cited with it match Congress.gov records, and the bill predates the report. The amount is lobbying spending for every issue on this report, not this bill alone, and none of it is paid to any member of Congress. View filing
PUGET SOUND ENERGY · lobbying firm or registrant: PUGET SOUND ENERGY
2026 Q3 report (Jul 1, 2026 – Sep 30, 2026) · posted Oct 20, 2026 · issue area: Energy/Nuclear
$300,000
Spent on own lobbying
…ct; H.R. 3898, Promoting Efficient Review for Modern Infrastructure Today (PERMIT) Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 4503, ePermit Act; H.R. 5600, SPEED and Reliability Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 6983, PRICE Act; H.R. 7258, Energy Emergency Leadership Act H.R. 772…
Congress inferred from the report year; bill number and the title cited with it match Congress.gov records, and the bill predates the report. The amount is lobbying spending for every issue on this report, not this bill alone, and none of it is paid to any member of Congress. View filing
XCEL ENERGY INC · lobbying firm or registrant: XCEL ENERGY, INC
2026 Q3 report (Jul 1, 2026 – Sep 30, 2026) · posted Oct 20, 2026 · issue area: Energy/Nuclear
$300,000
Spent on own lobbying
…e of Public Engagement and Participation within the Nuclear Regulatory Commission, and for other purposes; H.R. 4503, ePermit Act; Conservation Act amendments; H.R. 5600, SPEED and Reliability Act; H.R. 6336, Fair Allocation of Interstate Rates Act; H.R. 6633 High-Capacity Grid Act; H.R. 6983 PRICE Act; H.R. 7258, Energy Emerge…
Congress inferred from the report year; bill number and the title cited with it match Congress.gov records, and the bill predates the report. The amount is lobbying spending for every issue on this report, not this bill alone, and none of it is paid to any member of Congress. View filing
PPL CORPORATION · lobbying firm or registrant: PPL CORPORATION
2026 Q3 report (Jul 1, 2026 – Sep 30, 2026) · posted Oct 20, 2026 · issue area: Energy/Nuclear
$20,000
Spent on own lobbying
…ty issues generally; Issues related to energy grid supply chain; Draft legislation related to electric grid/energy infrastructure cybersecurity; Bayoumi, Elisa H.R. 5600, SPEED and Reliability Act; S. 1327, Advancing GETs Act of 2025; S. 5653 Bipartisan American Affordability and Jobs Act of 2026 (BAAJA) Artificial intelligence…
Congress inferred from the report year; bill number and the title cited with it match Congress.gov records, and the bill predates the report. The amount is lobbying spending for every issue on this report, not this bill alone, and none of it is paid to any member of Congress. View filing
NATIONAL RURAL ELECTRIC COOPERATIVE ASSOCIATION (NRECA) · lobbying firm or registrant: NATIONAL RURAL ELECTRIC COOPERATIVE ASSOCIATION (NRECA)
2026 Q3 report (Jul 1, 2026 – Sep 30, 2026) · posted Oct 20, 2026 · issue area: Energy/Nuclear
$1,289,734
Spent on own lobbying
…priations - H.R. 3632, Power Plant Reliability Act of 2025 - H.R. 3062, Promoting Cross-border Energy Infrastructure Act - H.R. 1, One Big Beautiful Bill Act - H.R. 5600: SPEED and Reliability Act of 2025 - H.R. 3699: Energy Choice Act - H.R. 4669: FEMA Act of 2025 - Transformer Security Inspection Act - H.R. 3632: Power Plant…
Congress inferred from the report year; bill number and the title cited with it match Congress.gov records, and the bill predates the report. The amount is lobbying spending for every issue on this report, not this bill alone, and none of it is paid to any member of Congress. View filing
PINNACLE WEST CAPITAL CORPORATION · lobbying firm or registrant: PINNACLE WEST CAPITAL CORPORATION
2026 Q3 report (Jul 1, 2026 – Sep 30, 2026) · posted Oct 20, 2026 · issue area: Energy/Nuclear
$340,000
Spent on own lobbying
H.R. 5600 - SPEED and Reliability Act H.R.4136 - NRC Office of Public Engagement and Participation Act: To establish an Office of Public Engagement and Participation wit…
Congress inferred from the report year; bill number and the title cited with it match Congress.gov records, and the bill predates the report. The amount is lobbying spending for every issue on this report, not this bill alone, and none of it is paid to any member of Congress. View filing
AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS · lobbying firm or registrant: AMERICAN ELECTRIC POWER COMPANY, INC. AND AFFILIATED CORPORATIONS
2026 Q3 report (Jul 1, 2026 – Sep 30, 2026) · amended · posted Oct 20, 2026 · issue area: Energy/Nuclear
$370,000
Spent on own lobbying
…57, Hydropower Relicensing Transparency Act; H.R. 3015, National Coal Council Reestablishment Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 5600, SPEED and Reliability Act; H.R. 1355, Weatherization Enhancement and Readiness Act; H.R. 4503, ePermit Act; H.R. 3843, Baseload Reliability Protection Act; H.…
Congress inferred from the report year; bill number and the title cited with it match Congress.gov records, and the bill predates the report. The amount is lobbying spending for every issue on this report, not this bill alone, and none of it is paid to any member of Congress. View filing
EDISON ELECTRIC INSTITUTE · lobbying firm or registrant: CAPITOL COUNSEL LLC
2026 Q3 report (Jul 1, 2026 – Sep 30, 2026) · posted Oct 19, 2026 · issue area: Energy/Nuclear
$50,000
Paid to lobbying firm
…R. 3638, Electric Supply Chain Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 4503, ePermit Act; H.R. 5600, SPEED and Reliability Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 6983, PRICE Act; H.R. 7258, Energy Emergency Leadership Act H.R. 7729,…
Congress inferred from the report year; bill number and the title cited with it match Congress.gov records, and the bill predates the report. The amount is lobbying spending for every issue on this report, not this bill alone, and none of it is paid to any member of Congress. View filing
PORTLAND GENERAL ELECTRIC · lobbying firm or registrant: PORTLAND GENERAL ELECTRIC
2026 Q3 report (Jul 1, 2026 – Sep 30, 2026) · posted Oct 19, 2026 · issue area: Energy/Nuclear
$60,000
Spent on own lobbying
…R. 3638, Electric Supply Chain Act; H.R. 3657, Hydropower Relicensing Transparency Act; H.R. 3843, Baseload Reliability Protection Act; H.R. 4503, ePermit Act; H.R. 5600, SPEED and Reliability Act; H.R. 6336, FAIR Act; H.R. 6633, High-Capacity Grid Act; H.R. 6983, PRICE Act; H.R. 7258, Energy Emergency Leadership Act H.R. 7729,…
Congress inferred from the report year; bill number and the title cited with it match Congress.gov records, and the bill predates the report. The amount is lobbying spending for every issue on this report, not this bill alone, and none of it is paid to any member of Congress. View filing
DUKE ENERGY CORPORATION · lobbying firm or registrant: DUKE ENERGY CORPORATION
2025 Q4 report (Oct 1, 2025 – Dec 31, 2025) · amended · posted Oct 19, 2026 · issue area: Energy/Nuclear
$2,030,000
Spent on own lobbying
…R. 1047 - Guaranteeing Reliability through the Interconnection of Dispatchable (GRID) Power Act (transmission and siting of large transmission infrastructure). H.R. 5600 - Streamlining Powerlines Essential to Electric Demand (SPEED) and Reliability Act (transmission market reform, siting of large transmission infrastructure, an…
Congress inferred from the report year; bill number and the title cited with it match Congress.gov records, and the bill predates the report. The amount is lobbying spending for every issue on this report, not this bill alone, and none of it is paid to any member of Congress. View filing
ITC HOLDINGS CORP · lobbying firm or registrant: ITC HOLDINGS CORP.
2026 Q3 report (Jul 1, 2026 – Sep 30, 2026) · posted Oct 19, 2026 · issue area: Energy/Nuclear
$170,000
Spent on own lobbying
…bility; H.R. 3638, Electric Supply Chain Act, provisions relating to assessing and strengthening the supply chains for electricity generation and transmission; H.R. 5600, SPEED and Reliability Act, provisions relating to federal backstop siting reform; H.R. 6336, Fair Allocation of Interstate Rates Act (FAIR Act), provisions re…
Congress inferred from the report year; bill number and the title cited with it match Congress.gov records, and the bill predates the report. The amount is lobbying spending for every issue on this report, not this bill alone, and none of it is paid to any member of Congress. View filing
CMS ENERGY CORP · lobbying firm or registrant: CMS ENERGY CORP
2026 Q3 report (Jul 1, 2026 – Sep 30, 2026) · posted Oct 16, 2026 · issue area: Energy/Nuclear
$150,000
Spent on own lobbying
…Act H.R. 3843, Baseload Reliability Protection Act H.R. 4690, Reliable Federal Infrastructure Act H.R. 4626, Dont Mess with My Home Appliances Act, EPCA reform H.R. 5600, SPEED and Reliability Act H.R. 4503, ePermit Act Standards for Consumer Gas-fired Instantaneous Water Heaters; Public Law No. 117-169 Inflation Reduction Act…
Congress inferred from the report year; bill number and the title cited with it match Congress.gov records, and the bill predates the report. The amount is lobbying spending for every issue on this report, not this bill alone, and none of it is paid to any member of Congress. View filing
CORPORATE ENERGY BUYERS ASSOCIATION · lobbying firm or registrant: CORPORATE ENERGY BUYERS ASSOCIATION
2026 Q1 report (Jan 1, 2026 – Mar 31, 2026) · amended · posted Aug 31, 2026 · issue area: Energy/Nuclear
$210,000
Spent on own lobbying
…g Economic Development (SPEED) Act; H.R.5576: Enhancing Geothermal Production on Federal Lands Act; H.R.5587: Harnessing Energy At Thermal Sources (HEATS) Act; H.R.5600: SPEED and Reliability Act; H.R.5631: Geothermal Ombudsman for National Deployment and Optimal Review Act; H.R.5639/S.896: Co-location Energy Act; H.R.5964: In…
Congress inferred from the report year; bill number and the title cited with it match Congress.gov records, and the bill predates the report. The amount is lobbying spending for every issue on this report, not this bill alone, and none of it is paid to any member of Congress. View filing
CORPORATE ENERGY BUYERS ASSOCIATION · lobbying firm or registrant: CORPORATE ENERGY BUYERS ASSOCIATION
2025 Q4 report (Oct 1, 2025 – Dec 31, 2025) · amended · posted Aug 31, 2026 · issue area: Energy/Nuclear
$300,000
Spent on own lobbying
…: ePermit Act; H.R.4776: SPEED Act; H.R.5576: Enhancing Geothermal Production on Federal Lands Act; H.R.5587: Harnessing Energy At Thermal Sources (HEATS) Act; H.R.5600: SPEED and Reliability Act; H.R.5631: Geothermal Ombudsman for National Deployment and Optimal Review Act; H.R.5639/S.896: Co-location Energy Act; H.R.5964: In…
Congress inferred from the report year; bill number and the title cited with it match Congress.gov records, and the bill predates the report. The amount is lobbying spending for every issue on this report, not this bill alone, and none of it is paid to any member of Congress. View filing
PORTLAND GENERAL ELECTRIC · lobbying firm or registrant: PORTLAND GENERAL ELECTRIC
2026 Q2 report (Apr 1, 2026 – Jun 30, 2026) · amended · posted Aug 28, 2026 · issue area: Energy/Nuclear
$90,000
Spent on own lobbying
…ional Coal Council Reestablishment Act; H.R. 3617, Securing Americas Critical Minerals Supply Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 5600, SPEED and Reliability Act; H.R. 1355, Weatherization Enhancement and Readiness Act; H.R. 4503, ePermit Act; H.R. 3843, Baseload Reliability Protection Act; H.…
Congress inferred from the report year; bill number and the title cited with it match Congress.gov records, and the bill predates the report. The amount is lobbying spending for every issue on this report, not this bill alone, and none of it is paid to any member of Congress. View filing
DUKE ENERGY CORPORATION · lobbying firm or registrant: DUKE ENERGY CORPORATION
2026 Q2 report (Apr 1, 2026 – Jun 30, 2026) · amended · posted Aug 5, 2026 · issue area: Energy/Nuclear
$2,280,000
Spent on own lobbying
…S. 465 - Guaranteeing Reliability through the Interconnection of Dispatchable (GRID) Power Act (transmission and siting of large transmission infrastructure). H.R. 5600 - Streamlining Powerlines Essential to Electric Demand (SPEED) and Reliability Act (transmission market reform, siting of large transmission infrastructure, an…
Congress inferred from the report year; bill number and the title cited with it match Congress.gov records, and the bill predates the report. The amount is lobbying spending for every issue on this report, not this bill alone, and none of it is paid to any member of Congress. View filing
NATIONAL RURAL ELECTRIC COOPERATIVE ASSOCIATION (NRECA) · lobbying firm or registrant: NATIONAL RURAL ELECTRIC COOPERATIVE ASSOCIATION (NRECA)
2026 Q2 report (Apr 1, 2026 – Jun 30, 2026) · posted Jul 21, 2026 · issue area: Energy/Nuclear
$980,000
Spent on own lobbying
…priations - H.R. 3632, Power Plant Reliability Act of 2025 - H.R. 3062, Promoting Cross-border Energy Infrastructure Act - H.R. 1, One Big Beautiful Bill Act - H.R. 5600: SPEED and Reliability Act of 2025 - H.R. 3699: Energy Choice Act - H.R. 4669: FEMA Act of 2025 - Transformer Security Inspection Act - H.R. 3632: Power Plant…
Congress inferred from the report year; bill number and the title cited with it match Congress.gov records, and the bill predates the report. The amount is lobbying spending for every issue on this report, not this bill alone, and none of it is paid to any member of Congress. View filing
PINNACLE WEST CAPITAL CORPORATION · lobbying firm or registrant: PINNACLE WEST CAPITAL CORPORATION
2026 Q2 report (Apr 1, 2026 – Jun 30, 2026) · posted Jul 21, 2026 · issue area: Energy/Nuclear
$270,000
Spent on own lobbying
H.R. 5600 - SPEED and Reliability Act H.R.4136 - NRC Office of Public Engagement and Participation Act: To establish an Office of Public Engagement and Participation wit…
Congress inferred from the report year; bill number and the title cited with it match Congress.gov records, and the bill predates the report. The amount is lobbying spending for every issue on this report, not this bill alone, and none of it is paid to any member of Congress. View filing
XCEL ENERGY INC · lobbying firm or registrant: XCEL ENERGY, INC
2026 Q2 report (Apr 1, 2026 – Jun 30, 2026) · posted Jul 20, 2026 · issue area: Energy/Nuclear
$370,000
Spent on own lobbying
…4136 - To establish an Office of Public Engagement and Participation within the Nuclear Regulatory Commission, and for other purposes; H.R. 4503, ePermit Act; H.R. 5600, SPEED and Reliability Act; H.R. 6336, Fair Allocation of Interstate Rates (FAIR) Act; H.R. 6633 High-Capacity Grid Act; H.R. 6983 PRICE Act; H.R. 7729 SURGE A…
Congress inferred from the report year; bill number and the title cited with it match Congress.gov records, and the bill predates the report. The amount is lobbying spending for every issue on this report, not this bill alone, and none of it is paid to any member of Congress. View filing
NATIONAL GRID USA · lobbying firm or registrant: NATIONAL GRID USA
2026 Q2 report (Apr 1, 2026 – Jun 30, 2026) · posted Jul 20, 2026 · issue area: Utilities
$280,000
Spent on own lobbying
…eration and facility retirement, including relevant provisions of FERC Order 1920. Federal policy on siting and permitting, including H.R. 4766, the SPEED Act, H.R. 5600 SPEED and Reliability Act, S.4944 American Energy and Mineral Infrastructure Act, S.4475 Unlock American Energy and Jobs Act. Issues relating to the power and…
Congress inferred from the report year; bill number and the title cited with it match Congress.gov records, and the bill predates the report. The amount is lobbying spending for every issue on this report, not this bill alone, and none of it is paid to any member of Congress. View filing
EDISON ELECTRIC INSTITUTE · lobbying firm or registrant: CAPITOL COUNSEL LLC
2026 Q2 report (Apr 1, 2026 – Jun 30, 2026) · posted Jul 20, 2026 · issue area: Energy/Nuclear
$50,000
Paid to lobbying firm
…ional Coal Council Reestablishment Act; H.R. 3617, Securing Americas Critical Minerals Supply Act; H.R. 3062, Promoting Cross-Border Energy Infrastructure Act; H.R. 5600, SPEED and Reliability Act; H.R. 1355, Weatherization Enhancement and Readiness Act; H.R. 4503, ePermit Act; H.R. 3843, Baseload Reliability Protection Act; H.…
Congress inferred from the report year; bill number and the title cited with it match Congress.gov records, and the bill predates the report. The amount is lobbying spending for every issue on this report, not this bill alone, and none of it is paid to any member of Congress. View filing
OHIO MUNICIPAL ELECTRIC ASSOCIATION · lobbying firm or registrant: OHIO MUNICIPAL ELECTRIC ASSOCIATION
2026 Q2 report (Apr 1, 2026 – Jun 30, 2026) · posted Jul 20, 2026 · issue area: Energy/Nuclear
$70,000
Spent on own lobbying
H.R. 3616, Reliable Power Act H.R. 1047, GRID Power Act H.R.2986 Expediting Generator Interconnection Procedures Act of 2025 H.R. 5600, Speed and Reliability Act of 2025 H.R. 4218, Clean Air and Economic Advancement Reform (CLEAR) Act (Rep. Carter) S. _____ Senate Democratic Discussion Draft T…
Congress inferred from the report year; bill number and the title cited with it match Congress.gov records, and the bill predates the report. The amount is lobbying spending for every issue on this report, not this bill alone, and none of it is paid to any member of Congress. View filing